1. Home
  2. Terms

Installation & service terms · Metro Cebu

Installation and Service Terms

Plain terms covering written site-survey quotes, fixed-price scope, HOA and PMO permits, power readiness, 1 to 2 year warranties, ₱500 diagnostic credits and RA 10173 or RA 4200 compliance.

  • WrittenFixed quote after survey
  • 1–2 yrHardware warranty
  • 1 yearWorkmanship cover
  • From ₱500Diagnostic (credited)
Quick answer

Cebu Security installations run on an itemized written quote after a free Metro Cebu site survey, backed by our fixed-price scope guarantee, 1 to 2 year hardware warranty, 1 year workmanship cover and ₱500 diagnostic credits on approved repairs.

Figures on our CCTV packages page are baseline tiers, while your signed quote fixes models, routing and schedules. This is general information, not legal advice.

Written estimates vs tiers

Written site-survey quotes and fixed-price scope

Our four packages (Home Starter ₱18,900, Home Plus ₱39,900, Business Pro ₱89,900 and Custom builds) are starting baselines for standard Metro Cebu layouts. After our free survey measures cable spans, wall types, retention days and optional UPS or solar gear, we issue an itemized written quote.

Under our fixed-price guarantee for Cebu CCTV installations, approved quotes hold for the surveyed cameras, conduit and app setup. Additions, extra runs past 100 m or storage upgrades happen only after written sign-off via email, Viber or WhatsApp.

HOA permits, utilities & access

Customer permit, utility and scheduling duties

On-time installations from our Cebu City base depend on site clearances, live utilities and open access during your booked window.

01 · HOA & condo PMO

Work permits and approvals

You secure HOA gate passes, condo PMO permits, mall clearances or lessor consent before install day. We provide crew IDs and scope sheets on request.

02 · Power & ISP

Power outlets and fiber lines

You supply active VECO or MECO outlets at the NVR spot and working PLDT, Globe or Converge internet for app setup. Solar 4G nodes use client SIM data.

03 · Scheduling

Hours and install duration

Surveys and installs run Mon–Sat, 08:00–18:00 PHT, taking 1 day for 4 to 8 cameras and 2 to 3 days for 16-camera sites. After-hours slots require advance booking.

04 · Site access

Wall and cabinet access

Gates, ceilings and NVR closets must remain open during your slot. Missing PMO passes or locked rooms move work to the next scheduled dispatch.

Warranty & ₱500 diagnostics

Hardware warranty, workmanship terms and diagnostic credits

Equipment supplied by Cebu Security carries local Cebu City warranty coverage alongside published repair rates for existing systems.

Coverage or feeTerm or rateScope and conditions
Hardware warranty1 to 2 years1 year on Home Starter, 2 years on Home Plus and Business Pro, or per SLA on Custom builds
Workmanship cover1 yearCovers terminations, conduit mounting, outdoor IP67 seals and configuration on every install
Diagnostic visitFrom ₱500Tests power rails, cables, ports and drives in Metro Cebu; credited in full toward approved repairs
Repair labor₱350 to ₱800 (PMS from ₱1,500)Password reset ₱350, app setup ₱350, HDD swap ₱450 plus drive, cable re-run ₱800 (to 20 m); PMS every 3–6 months

Impact damage, tampering, unprotected VECO/MECO surges and client-supplied units fall outside warranty cover. See our warranty page and repair price list.

Privacy, audio & BPLO duties

Client compliance under RA 10173, RA 4200 and BPLO rules

While we mount and configure your system to plan, the property owner or business operator acts as data controller for lawful operation.

  • Data Privacy Act (RA 10173): Post CCTV signage, mask neighbor windows where appropriate, protect NVR logins and keep bedrooms, restrooms and changing rooms unfilmed (privacy notice).
  • Anti-Wiretapping Act (RA 4200): Cameras ship video-only by default with microphones off; gate intercom audio activates only at entry points upon client request.
  • Municipal BPLO ordinances: Cebu City (Ord. 2381 and 2759), Mandaue (Ord. 12-2011-669), Talisay (Ord. 2012-09) and Consolacion (Ord. No. 11, s. 2022) mandate commercial CCTV, while Lapu-Lapu holds a 2015 proposal. Confirm active rules with your city BPLO.

This is general information, not legal advice. Consult legal counsel or your BPLO on site-specific duties, or see our business-permit CCTV guide and contact page.

Contract & billing terms

Questions about Cebu Security installation terms

Does Cebu Security charge extra if drilling concrete takes longer on install day?

No. Once you approve an itemized written quote after our Metro Cebu site survey, our fixed-price guarantee covers the agreed cameras, conduit and labor, with extra fees applying only to written client change orders.

Who arranges HOA gate passes or condo PMO permits before installation day?

The homeowner, tenant or authorized representative arranges HOA passes, condo PMO permits or landlord consent before install day. Cebu Security provides technician names, IDs and scope sheets for your building admin.

What happens if my PLDT, Globe or Converge fiber is not active yet on install day?

Our crew still mounts cameras, runs conduit and enables local recording onto the NVR hard drive without internet. Once your fiber goes live later, mobile app setup can be booked at our ₱350 rate.

Does the ₱500 diagnostic fee still apply if I decline the repair quote?

Yes. The ₱500 diagnostic fee covers technician travel and on-site testing of power supplies, cables, ports and drives when repairs are declined, whereas approving the quote credits all ₱500 onto your repair bill.

Can I add extra cameras or modify cable routes after approving a written quote?

Yes. Added cameras, longer conduit runs or storage upgrades requested after survey sign-off are quoted separately and installed only after your written confirmation via email, Viber or WhatsApp.

Written quotes · Mon–Sat PHT

Ask about our service terms.

Clarify quote terms, HOA permit documents or warranty scope before our engineer walks your site.

  • Phone / Viber+63 900 000 0000
  • Email[email protected]
  • Office / Dispatch
    Yichan Techtrade
    MCLin Bldg, M.J. Cuenco Ave.
    Cebu City, Philippines
  • Survey hoursMon–Sat · 08:00–18:00 PHT
Secure channelForm 01 / Site survey
Reply within the day · No spam